EasyManua.ls Logo

RS SAILING 21 - 5.5 - Hoisting the Jib

Default Icon
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
61
5.5 - Hoisting the Jib
a) b)
c)
Shackle the jib halyard to the
head of the jib.
Hank the luff of the jib onto the forestay.
Hoist the jib by pulling on the line which comes out of the starboard side of the
mast, just below the level of the gooseneck.
When the jib is almost fully hoist, a rope loop will emerge from the hole in the
mast.
Hook the snap shackle on the block (added in step 4.9b) onto this rope loop and
continue to hoist the jib.

Related product manuals