Horizontal End Suction Pump for Chemical Process, ASME B73.1-2001
Installation, Operation, and Maintenance Manual CPP21
place. If stored under unfavorable climatic conditions, this protective period may be considerably reduced.
Should the anticorrosive layer become damaged, it can be repaired by repainting or respraying.
Anticorrosive layers inside the pump housing must be removed with process
neutral solvents before commencing pump operation.
When removing the protective coating with a neutral solvent, follow the safety
instructions of the solvent manufacturer carefully.
The anticorrosive layer applied to the exposed parts does not need to be
removed before putting the pump into operation.