Horizontal End Suction Pump for Chemical Process, ASME B73.1-2001
Installation, Operation, and Maintenance Manual – CPP21
Figure 8.35 Paired nuts to tighten the stud.
c. Tighten both nuts as shown.
Figure 8.36 Tightening the paired nuts.
d. Use the spanner to tighten the stud.
Figure 8.37 Tightening the studs.
e. Loosen the two nuts as shown.