EasyManua.ls Logo

Ruris DAC 310 - Pre-Operative Checks

Default Icon
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
15
8. PRE-OPERATIVE CHECKS.
Make sure that :
The machine is mounted correctly and completely.
The fuel mixture complies with the indicated proportion of oil and petrol: 25 ml
oil / 1 liter of petrol
The oil used is RURIS: RURIS 2 TT-MAX or API classification oil: TC or higher
The reducing head is filled with RURIS Vaseline, the indicated level is given
by the Vaseline located on the tip of the screw in the supply area according to
the installation mode presented below according to figure 1. Its capacity is
approx. 20 grams
The assembly of the cutting disc or autocut is done correctly according to the
information from :
Mounting-disassembly of the cutting disc and autocut.
Careful! When mounting the cutter disc, use the lock-blocker to unzip the tightening nut
clockwise. After mounting the cutter disc, make sure that the nut is tightened and the
cutting disk is well fixed, guided and does not show deformations or cracks on its surface
Fig. 1.1
The actuation of the reducer transmission is done by actuating the accelerator
lever to the maximum.
Check that the protection device is mounted correctly.
.

Related product manuals