MAGIC 8. REPAIRS / SERVICE SCHEDULE
Saeco International Group REV.5 SEPT.2004 Page 1/2
1. Repairs schedule:
The repairs schedule, together with the service schedule, lists all relevant activities to be
performed in an efficient sequence.
Activities
1 Visual check (transport damage)
2 Record of machine data
3 Functional check / Error analysis
4 Opening of machine
5 Visual check (leakages)
6 Mechanical systems check (functional test)
7 Defect detection
8 Modifications check
9 Service operations according to service schedule
10 Internal cleaning
11 Functional test (with open machine / leakage test)
12 Assembly
13 Final test according to test schedule
14 Steam off (winter)
15 External cleaning
16 Lubrication of brewing unit
17 Insulation test
18 Documentation
2. Service schedule:
Service activities
R = Replace C = Clean VC = Visual check
AT = Acoustic test D = Descale A = Adjustment
Component
Activity
Equipment
Water filter
R
Lip seal / Water tank
R
Coffee return flow valve
R
Valve spring
R
Valve plug O-ring
R
Valve plug O-ring
R
Filter (brewing unit)
C / VC
Fat solvent
Hose connections
VC
Pump
VC / AT
Gearmotor
AT / VC
Grinder
C / A
Vacuum cleaner / brush
Doser
C
Vacuum cleaner / brush
Water circuit
D
Descaler (Saeco)
HWS valve
VC / R
Water outlet (valve plug)
C
Fat solvent / brush
O-ring (boiler connection /
instantaneous water heater)
R

Table of Contents