EasyManua.ls Logo

SAJ H2-5K-T2 - System Application Diagram

SAJ H2-5K-T2
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hybrid Solar Inverter User Manual
33
34
4.10. System Application Diagram
CT wire
Corresponding port in the meter
IA (white)
13
IA (blue)
14
IB (white)
16
IB (blue)
17
IC (white)
19
IC (blue)
21
NOTES:
The sequence of the grid cable must be connected correctly; otherwise, an error “Master Grid Phase
Error” will be occurred. For details, refer to Chapter 7 “Troubleshooting”. If this error occurs, switch the
position of L2 and L3 cables.
If the length of the RJ45 cable between the inverter and the meter exceeds 20 meters, install a 120Ω
resistor in ports 24 and 25 on the meter.

Other manuals for SAJ H2-5K-T2

Related product manuals