EasyManua.ls Logo

SAMES KREMLIN Inogun M - Procedure D2: Replacement of low voltage cable

SAMES KREMLIN Inogun M
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Index revision : C - July 2021 33 7132
7.3.7. Procedure D2: Replacement of low voltage cable
• Step 1: Push the 2 bolts so that the powder
hose can be unlocked and removed.
• Step 2: Remove the air hose.
• Step 3: Loosen the 3 screws.
• Step 4: Remove the base plate from the
handle and disconnect the blue connec-
tor from the control box.

Table of Contents