EasyManua.ls Logo

Samsung AM072FXVAFH series - Appropriate Measures for Different Symptom; Outdoor Unit Operation Flow

Samsung AM072FXVAFH series
293 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-18 Samsung Electronics
4-4 Appropriate Measures for Different Symptom
4-4-1 Outdoor Unit Test Operation Flow
If the Auto Trial Operation is not completed - UPis displyed(UnPrepared)
Prior to starting the air conditioning operation after the
initial installation and Auto Trial Operation is carried out.
This process, the stable operation to protect the system and
verify the defect of the product.
1. Tracking is complete and after the initial installation, if you do not have
a history of Auto Trial Operation is completed, UP will be displayed.
2. Execute the Auto Trial Operation by Tact Switch.
3. UP display disappears after Auto Trial Operation is complete,
normal operation is possible.
4. Auto Trial Operation is completed, if there is a history, normal
operation execution.
No
Yes
Was Auto Trial Operation
Completed?
Power On
Trial Operation available
LED display the UP (UnPrepared)
Preilminary check for the Test Operation
Execute the Auto Trial Operation

Table of Contents

Related product manuals