EasyManua.ls Logo

Samsung AM300MXVGNR4ET - Page 32

Samsung AM300MXVGNR4ET
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32
Base construction and installation of the outdoor unit
Examples of draining work
AͱϑϩθЇʀϩϩ˵ʪʒθɇɇ˝ʪʒϩʀ˵иϩ˵θʪ˙ͱθʀʪʒʀͱʀθʪϩʪϑɇʒɇʪϑЇθʪϩ˵ɇϩиɇϩʪθࣛΧθͱͱѣ˝иͱθϑʒͱʪ࢏
For smooth draining of defrost water, make sure to apply 1/50 slope.
Construct a drainage around the outdoor unit to prevent the defrost water (from the outdoor unit) from
ϑϩɇ˝ɇϩ˝ࡥͱЭʪθѤͱи˝ͱθ˙θʪʪі˝ʪɇθϩ˵ʪϑϩɇɇϩͱϑΧɇʀʪ࢏
When the outdoor unit is installed on the roof, check the strength and waterproof status of the roof.
(Unit : mm)
960
760
100
80
80
80
ߨߢঌ
100
X
X’
Direction of the
drainage (Slope 1/50)
<Drainage work for single installation>
B
A
50
100
150 100
<X-X’ SECTION>
80
80
80
80
80
80
80
80
ߨߢঌ
ߨߢঌ
200
BB
200
Direction of the drainage
(Slope 1/50)
<Drainage work for module installation>
(Unit : mm)
Aɇϑϑѣʀɇϩͱ DVM S Small Type DVM S Large A Type DVM S Large B type
A 940 1,350 1,350
B 740 1,150 1,150

Related product manuals