Do you have a question about the Santon PremierPlus 100 and is the answer not in the manual?
Details on compression fittings and thread types for unit connections.
Requirements for the cold water supply connection, including pipe size.
Description and installation of the combined valve assembly.
Guidance on installing a drain tap for the unit.
Building Regulation G3 requirements for safe discharge conveyance.
Specifies the diameter and material for discharge pipe D1.
Installation requirements and placement for the tundish.
Details on the material, sizing, and fall for discharge pipe D2.
Provides an example calculation for sizing discharge pipe D2.
Lists required pipework connections for direct cylinders.
Electrical connection requirements and safety for direct units.
Lists required pipework connections for indirect cylinders.
Electrical connection requirements and safety for indirect units.
Guidance on choosing a suitable boiler for indirect systems.
Requirements for controlling the primary circuit for indirect units.
Notes on compatibility with central heating controls.
Step-by-step guide for filling the cylinder with water.
Procedures for checking system integrity after filling.
Commissioning steps specific to direct heating units.
Commissioning steps specific to indirect heating units.
Overview of ongoing maintenance needs for safety and performance.
Method for internal inspection of the cylinder.
Procedure for testing safety valves.
Instructions for cleaning the strainer element.
Steps for draining and preparing for immersion heater maintenance.
Detailed guide on removing and replacing immersion heaters.
How to check and recharge the expansion vessel pressure.
Steps for re-commissioning after maintenance.
Specific maintenance notes for direct units.
How to adjust thermostats on direct units.
How to adjust thermostats on indirect units.
Notes on expected hot water flow characteristics.
Information regarding potential operational issues.
Details of the warranty period and conditions for the product.
Checklist for primary system settings on indirect units.
General checklist items applicable to all systems.
Checklist items specific to unvented systems.
Checklist items for thermal store systems.
Final checks related to installation compliance and customer handover.
Details on compression fittings and thread types for unit connections.
Requirements for the cold water supply connection, including pipe size.
Description and installation of the combined valve assembly.
Guidance on installing a drain tap for the unit.
Building Regulation G3 requirements for safe discharge conveyance.
Specifies the diameter and material for discharge pipe D1.
Installation requirements and placement for the tundish.
Details on the material, sizing, and fall for discharge pipe D2.
Provides an example calculation for sizing discharge pipe D2.
Lists required pipework connections for direct cylinders.
Electrical connection requirements and safety for direct units.
Lists required pipework connections for indirect cylinders.
Electrical connection requirements and safety for indirect units.
Guidance on choosing a suitable boiler for indirect systems.
Requirements for controlling the primary circuit for indirect units.
Notes on compatibility with central heating controls.
Step-by-step guide for filling the cylinder with water.
Procedures for checking system integrity after filling.
Commissioning steps specific to direct heating units.
Commissioning steps specific to indirect heating units.
Overview of ongoing maintenance needs for safety and performance.
Method for internal inspection of the cylinder.
Procedure for testing safety valves.
Instructions for cleaning the strainer element.
Steps for draining and preparing for immersion heater maintenance.
Detailed guide on removing and replacing immersion heaters.
How to check and recharge the expansion vessel pressure.
Steps for re-commissioning after maintenance.
Specific maintenance notes for direct units.
How to adjust thermostats on direct units.
How to adjust thermostats on indirect units.
Notes on expected hot water flow characteristics.
Information regarding potential operational issues.
Details of the warranty period and conditions for the product.
Checklist for primary system settings on indirect units.
General checklist items applicable to all systems.
Checklist items specific to unvented systems.
Checklist items for thermal store systems.
Final checks related to installation compliance and customer handover.
| Model | PremierPlus 100 |
|---|---|
| Power Rating | 3 kW |
| Voltage | 230 V |
| Frequency | 50 Hz |
| Protection | IPX4 |
| Type | Unvented Cylinder |
| Capacity | 100 Litres |



Loading...