EasyManua.ls Logo

Sanyo Big PACi 18 Series - Test Run Procedure

Sanyo Big PACi 18 Series
275 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
2-22
2-24. Test Run Procedure
YES
YES
YES
NO
NO
NO
Fig. 2-22
Recheck the items to check
before the test run.
(See 2-11)
Check the combination (wiring) of
indoor and outdoor units.
(See 2-26-1)
Is system “single-type”?
(1 indoor unit is connected
to 1 outdoor unit)
Are multiple outdoor units
used?
(See 2-26-2) How to Set the Outdoor
Unit System Address
Set the outdoor unit system
address.
(See 2-26-1, -2) How to Set Automatic
Address
Set the automatic address
setting from outside unit.
Indicate (mark) the
combination number.
Turn the power back ON to
the indoor unit.
(See 2-26-3, -4)
Set the indoor unit control
unit to “TEST”.
(See 2-26-3)
Can
operation be
started?
(See 2-13)
Turn ON
the indoor
and outdoor
power.
(Automatic
Address)
(Automatic
Address)
(See 2-25)
Turn ON
the indoor
and outdoor
power.
Refer to “Table of
Self-Diagnostic
Functions” to check
the system.
In addition, refer to
2-26 and correct any
items that need to be
corrected.
Note: Check the indoor-
side drainage.
SM830161Book.indb22SM830161Book.indb22 2008/06/039:09:042008/06/039:09:04

Table of Contents

Related product manuals