EasyManua.ls Logo

Sanyo PLC-XF46N - Power Supply and Ballast Unit Removal

Sanyo PLC-XF46N
186 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 25 -
SW-Power supply unit(25V)
A
A
A
A
B
5-2
Switch Power Supply(25V) unit removal.
Fig.5-2
1. Remove 4 screws-A, remove screw-B and remove the Switch power supply(25V) unit.
(See Fig.5-2 )
5-3
Switch Power Supply(25V) unit disassemblies.
1. Remove 2 screws-A and remove the Switch power supply(25V)Board.
2. Unhook the 4 Fixer Clamps and remove the Motor &Audio Board.
3. Remove 2 screws-B and remove the F-G net Board.
4. Remove 3 screws-C, remove 3 washers and remove the grounding lead.
(See Fig.5-3 )
Mechanical Disassemblies
Switch Power Supply (25V)
Board
A
A
Motor and Audio
Board
The Motor and Audio Board is fixed with
holder by hook.
F-G net Board
B
B
C
C
C
Grounding
Lead
Grounding
Lead
Grounding
Lead
Washer
Washer
Washer
Fig.5-3

Other manuals for Sanyo PLC-XF46N

Related product manuals