EasyManua.ls Logo

Sapling SBP Series - Page 24

Sapling SBP Series
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
The Sapling Company, Inc.
670 Louis Drive
Warminster, PA 18974
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
7 8
7) Attach the housing to the gang box using the
#6-32x1 screws.
8) To proceed with the installation instructions,
please follow the “Uniform Stage Installation
section in this manual. Once done, to complete the
wall mounted clock installation, follow the below
additional steps.
Wall Mounted Clock Mechanical Installation
9
9) With the clock powered and properly functioning, the next step would be to remove the adhesive clear
protective film from the clock filter, as shown in the below image.

Related product manuals