EasyManua.ls Logo

Sartorius MA35M-230N - Warmup Time; Leveling the Moisture Analyzer; Installing the Aluminum Panels; Part No. YDS05 MA)

Sartorius MA35M-230N
45 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Warmup Time
To deliver exact results, the moisture analyzer must
warm up for at least 30 minutes every time you
connect it to AC power or after a relatively long
power outage.
Only after this time will the analyzer has reached
the required operating temperature.
Leveling the Moisture Analyzer
Purpose:
To compensate for unevenness at the place
of installation
This is particularly important for testing liquid
samples, which must be at a uniform level in the
sample pan
Always level the moisture analyzer again any time
after it has been moved to a different location.
§ Extend or retract the front and/or rear leveling feet
as needed to adjust the moisture analyzer
Installing the Aluminum Panels (Optional;
Part No. YDS05MA)
! To prevent burns, allow the glass panels to cool
sufficiently before removing them
! Do not handle the aluminum panels with oily or
greasy fingers
! Do not scratch the aluminum panels; do not use
abrasive or corrosive substances to clean the
aluminum panels
§ Remove the 2 rubber caps and the 2 screws
beneath them, and then remove the panel retainer
§ Remove the glass panels
§ Position the aluminum panels in the retainer
§ Fasten the aluminum panels with the retainer and
screws; replace the 2 rubber caps

Related product manuals