EasyManua.ls Logo

sarvaria Multilift - Step 15 Reverse Power Cord (If Required)

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 17
Part No. 000643, 26-m02-2013 Multilift Installation Guide
Step 15
Reverse power cord (if required)
Reverse the power cord from one side of the tower to the
other.
Procedure
Follow these steps to reverse the power cord from the left
side to the right side of the tower.
1 Unplug the power cord from the wall outlet.
2 Remove the power cord plug from the cord.
3 Remove the power cord grommet from the tower.
4 Remove the cord from the zip-tie anchor point(s).
Figure 24
Power cord on left side
5 Reroute the power cord to exit through the bottom
right side panel knockout in the tower.
6 Reinstall the power cord grommet on the right side
panel.
7 Reinstall the plug on the cord.
8 Reanchor the power cord using the supplied zip-ties.
Figure 25
Power cord on right side