EasyManua.ls Logo

Scania OC16 - Maintenance

Scania OC16
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPM 320 en-GB 20
© Scania CV AB 2019, Sweden
Maintenance
Maintenance
The maintenance programme covers a number of
points that are divided into the following sec-
tions:
Lubrication system.
Air cleaner.
Cooling system.
Fuel system.
Electrical system.
Miscellaneous.
WARNING!
Block the starting device and switch off the man-
ual fuel cock when working on the engine. If the
engine starts unexpectedly, there is a serious risk
of injury.
There is always a risk of sustaining burns when
an engine is hot. Particularly hot parts are turbo-
chargers, oil sumps, hot coolant and oil in pipes
and hoses.
The maintenance programme includes the fol-
lowing:
R maintenance: One event when taken into
service.
S maintenance: Minimum basic maintenance.
M maintenance: More extensive mainte-
nance.
L maintenance: Includes nearly all mainte-
nance items in the form.
XL maintenance: Includes all maintenance
items in the form.
During a period, the sequence is S-M-S-L-S-M-
S-L-S-M-S-XL.
XL
6000
S
5500
M
5000
S
4500
L
4000
S
3500
M
3000
S
2500
L
2000
S
1500
M
1000
S
500
313 153
IMPORTANT!
On delivery a Scania engine is optimised for its
application. However, regular maintenance is
necessary to
prevent unplanned stops
extend the service life of the engine
maximise the long-term emission perfor-
mance of the engine
give the best possible operating economy.

Table of Contents