EasyManua.ls Logo

Schaltbau M36W - Installation Procedures; Checking Parts for Transport Damage; Assembly into Mounting Walls

Default Icon
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
2017-12-21 / V1.3
Connectors Series M – Installation and Maintenance Instructions
Installation
5. Installation
DANGER
The connectors contain components that carry voltage. Deadly hazard!
Always observe the following safety regulations before beginning any work on electrical
constructions:
X
Disconnect
X
Ensure that it is not possible to reconnect unintentionally
X
Clearly mark your work area
X
Make sure that there is no voltage present
X
Earth and short circuit the installation
X
Insulate or cover adjacent energized parts
X
Only an electrically skilled person may determine if there is no voltage present
NOTICE
During installation, ensure that dirt caused by sur-
rounding construction activities does not get into
the connectors.
5.1 Check Parts for Transport Damage
NOTICE
The functional safety of the connectors is no longer
guaranteed when parts are damaged.
X
Before installing, check all parts for any possible
transport damage.
X
Do not install any damaged parts.
5.2 Assembly of Receptacles / Plugs into
a Mounting Wall
Preparing measures
Appropriate mounting holes have to be prepared de-
pending on the model for the mounting of receptacles
and plugs with ange or thread into a mounting wall
(refer to section „Mounting holes / thread“).
In order to relieve the contacts from strain when assem-
bled, a strain relief has to be provided on the mounting
wall.
Fastening of receptacles / plugs with ange
For the fastening of receptacles and plugs with ange
you need screws according to the following table:
Series Model of receptacle / plug Size of screw
(number)
M1
Receptacle/plug with ange M3 (2x)
Angle receptacle with ange M3 (4x)
M3
Receptacle/plug with ange and
angle receptacle with ange
M4 (4x)
The length of the fastening screws as well as appropri-
ate thread locker elements have to be determined ac-
cording to the assembly situation.
The torque has to be determined according to the
screws used and to the materials existing on the site of
the assembly.
Fastening of receptacles / plugs with thread
For the fastening of receptacles with thread, corre-
sponding threads have to be prepared in the mounting
wall.
Torque for all receptacles with thread: 2.5 Nm.
Dimensions
The measures for the dierent receptacles and plugs
with ange or thread may be taken from the following
table:

Related product manuals