EasyManua.ls Logo

Schweigen CL6272 - Installation Steps

Schweigen CL6272
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 16
7. Installation
Step 1
Secure rangehood to the wall using only primary mounting
points. Check the level of the rangehood and adjust
accordingly if necessary. Once level, continue to secure
the rangehood via the secondary mounting points.
Step 2
Feed through aluminium exi duct from the outlet block to
the kitchen ceiling.
Step 3
Place ue covers on.
Step 4
Attach inside ue cover to the wall mounting bracket.
NOTE: Please make sure that all plastic protection on the
rangehood and lters are removed before use.

Related product manuals