EasyManua.ls Logo

Seagull Models ZERO MS:123 - Page 22

Seagull Models ZERO MS:123
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ZERO. Instruction Manual.
22
6) Install a wheel and two wheel collars on
the main landing gear. Secure the collars.
Cut.
7) Install the wheel wells after adjusting the
retracts. Roughen the bottom side of the well
and glue the wells using C/A glue as shown.
2.
8.
3.
6.
2.
4.
5.
7.
2.
7.
5) Install the linkage into the connector on the
end of the retract unit as shown. Mounting the
landing gear to the rail with four M3x 2.5mm.
M3x25mm.

Related product manuals