EasyManua.ls Logo

Seca 664 - Fault Handling Procedures; Time Base Derivation; Data Storage on Chip Card; Chip Card Functions

Seca 664
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Model 664 15
GB
3. Before you start…
Unpacking
Remove the packaging and place the
scale on a firm, level surface.
The scope of supply includes:
• Weighing platform
• Column with display head
• 2 mounting screws
• 2 serrated lock washers
• 1 Allen key
• 1 screwdriver
• 1 seca mains unit
• 1 set of operating instructions
Fitting the column
The column and display head are fitted to the weighing platform.
Guide the connecting cable through
the opening.
Place the column at the intended point
at the end of the rail and tighten up the
screws.
Now connect the battery pack.
Connecting battery pack
Carefully get the scale upright so that
the base of the scale is accessible.
Connect the connecting cable from the
column to the electronics box.
Undo the screws of the battery com-
partment and take off the cover.
Connect the plug contacts to the bat-
tery pack inside.
Close the cover and then turn the scale
back up the right way.

Other manuals for Seca 664

Related product manuals