In an optimized start up sequence, the condenser fan will continue to run until a successful start has been
achieved, or until the CCU has tried to start 10 times.
After ten failed start attempts, 10 minutes will pass and the compressor will perform another ‘single’ start
attempt. After 6 repeats of these single start attempts with a 10 minute break, the compressor will not
start again, until the power supply has been disconnected then switched back on.