EasyManua.ls Logo

Segway x2 SE - Unpack and Assemble the Segway PT and Charge the Batteries

Segway x2 SE
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Segway PT Product Orientation > i2 > x2
Page 6 of 29 p/n __________________
Coach’s Manual © Segway Inc. 2015 All rights reserved
EXPLAIN
DO/COACH
Unpack and Assemble the Segway PT and Charge the
Batteries
The Segway PT comes in a box and must be
removed. To remove the PT simply take out the user
materials, LeanStear box and cardboard divider.
Once the box is empty tilt it on its side and the
Segway PT will roll out. Attach LeanStear, Handlebar
and InfoKey Dock to complete the unit.
If the rider will need to assemble
the Segway PT, briefly show them
how to properly remove it from the
packaging.
Two Li-ion Batteries come in a separate box and must
be installed on the base of the Segway PT. Simply tilt
the Segway PT backwards to expose the base and
seat the batteries on the front and back. Be sure to
document the serial numbers for the front and back
batteries.
Briefly explain battery installation
and point out the directions in the
User Manual. You may choose to
go through assembly in detail, but
it is not part of the Product
Orientation, which focuses on safe
riding and operation.
Point out batteries and the bolt
holes.
To maximize the performance of your Segway PT
Batteries, fully charge your Batteries for at least 12
hours, once a month, or after every 12 hours of
operationwhichever comes first. Charge your
Batteries only when they are within the specified
charging temperature range, which can be found in
the User Manual.
Show Charge Port.
For additional information, see “Specifications for the
Batteries” in the User Manual.

Other manuals for Segway x2 SE

Related product manuals