508.366.1488 | www.semshred.com
9
3.2 Pre-Operational Checklist
After all electrical and mechanical machine elements have been inspected and any defects corrected, the following
pre-operational checklist should be used to ensure the disintegrator is ready for operation.
Have all installation and preparation instructions been read and followed?
Have the disintegrator operator and all other necessary personnel been fully trained on machine operation and
all machine safety mechanisms?
Have sufficient location clearances been allowed?
Has the equipment been grounded as required by local codes and/or Article 250 of the National Electric Code?
Have all motors been checked for rotation?
Have all machine controls, buttons, and limit switch safeties been checked for proper functioning?
Have the cutting and screen chambers been checked for foreign matter?
Have the drive belts been checked for alignment and tension?
Is the machine properly closed with all visible fasteners tight?
Are all accessory components electrically and mechanically connected with proper support and with all fasteners
tight?
Are the fan cyclone and filter bags empty? (auxiliary equipment)
Has the fan/cyclone been verified for proper rotation direction?
Are all electrical enclosure boxes tightly closed and clamped shut?
Are all personnel clear of the machine?
Is the conveyor clear?