1.5.2. Wall Mount Installation
Check Boxes for Correct Content, Pre-Installation Preparation
Site Selection
The charging station should be positioned such that the distance between the charging station and electric
vehicle is sufficient to minimize likelihood of damage (suggested min. 3 ft). Two alternatives are illustrated
below:
Preparing the Wall
At the selected location, place the wall-mount on the wall such that the top of the wall-mount is at a height of
49 inches (Check local codes).
The equipment should be installed at least 18 inches above the floor.
With the help of a Level, ensure the wall-mount is in an upright position.
Mark locations for the bolt. If running wire inside wall also mark Wire Wall Hole.
If wall is made of solid concrete or brick, use anchor bolts to secure the wall-mount to the wall. For
walls other than concrete, use fasteners appropriate for the material.
Now, run conduit up to wire wall hole location previously marked on the wall. Run the wires through this
conduit up to wire wall hole location with at least 18” (+wall thickness) free wire. See illustration for clarity.
Installation Manuals Series 7 / 7 Plus EV Charging Station - 1