CHAPTER 5. DISASSEMBLY PROCEDURE 
If, in carrying out repairs and modifications, the work requires the use of arc- and flame-producing apparatus, such as welding, brazing and 
solderingequipment, this work shall only be started after the rooms have been thoroughly ventilated. While the work is being carried out, the 
mechanical venti-lation, if any, shall be kept in constant operation and all windows and doors kept open. In the case of repairs to parts of the 
refrigerant circuit, it maybe necessary that not only the workman but also a second person shall be present for observation and 
assistance.Necessary protective equipment shall be available and, in the case of open flames or arcs, fire extinguishing apparatus shall be ready to 
hand.Welding and brazing shall be carried out by qualified workmen. 
 
[1] INDOOR UNIT 
1) Open the open panel and remove it. 
 
 
 
 
 
 
 
 
 
 
 
2) Remove a screw fixing the cord holder. 
 
 
 
 
 
 
 
 
 
 
 
 
 
3) Remove the cord holder. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
4) Loosen the screws on the terminal board and remove the unit-tounit 
wiring connected with the board. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
5) Slide out the 2 air filters. 
6) Remove 5 screws fixing the front panel. 
5-1