EN-23
ENGLISH
Parts Name Maintenance Cycle Max Service Life Replacement Model
Plasmacluster Ion
Generating Unit
*
1
Every 6 months or more often if
necessary
19,000 hours
*
2,3
IZ-C90ME
*1: In the following, "Plasmacluster Ion Generating Unit" is abbreviated as "Unit".
*2: The replacement time will be announced by the Unit Replacement lamp.
*3: Designated App notifies when each replacement part should be replaced according to usage.
PLASMACLUSTER ION GENERATING UNIT
(Electrode Section)
REPLACEMENT AND MAINTENANCE CYCLE
MAINTENANCE
1.
Remove the Unit Cover, and pull out
the Unit Holder.
Unit Cleaning Brush
2.
Remove dusts from the Electrode
Section.
Unit Cleaning Brush
Electrode
After
cleaning
Before
cleaning
Around the base
Electrode
3.
Insert the Unit Holder in the product,
and install the Unit Cover.
Click
NOTE
• Do not clean with anything other than the Unit
Cleaning Brush. Doing so could lead to failures
in the Unit.
• A bent electrode could be cut off and dropped
during the cleaning process, but it will not
change the performance.
• Do not touch the electrode directly. Doing so
could lead to pain/itching.
• Do not transform the Electrode Section. Doing
so can damage it.
• Do not touch the Connection Terminals. Doing
so can damage them.
Connection Terminals
REPLACEMENT
Unit Replacement lamp
When the total operation time exceeds 17,500
hours, the Unit Replacement Lamp will flash to
indicate that the Unit needs replacement.
Operating time Explanation
17,500 hours
Flashes slowly
Replace the Unit.
19,000 hours
Flashes quickly
No Plasmacluster ions will
be released by the Unit.
* The replacement time is not related to the selected
operation mode.