I
“-
SF-7300
S*’-735O
(4) Power source
1) The powersupplyline shcu~ have a capacity of morethan 15A,
capable of supplyiW more than WY. of the rated vokqe at fun
load.
2) Do not use an extensioncord or operate any other quipment
fromthe same wall outlet.
(5) Ground connection
1)
Use a prcperv grounded(thr- pr~) wd odet that meets an
nationaland localebctrfcal codespecifications.
How the copier machine Is carried
When moviW the c+ier, remove the receivingtray and carry it
by btiim the Identath in tie bottomof the ma&ine.
3. Releasing locks and installlrtg supplles
A. Removing the developer unit
(1) Open
tie frontpanel.
(2)
Pullthe devdcper unitkver towardsyou.
=1
1
(4) H* the ca~ handk of the deve~r unitand remove it.
NOTE: Unfeeethe devefcper unitis he~ by the handle, the
deve~r unitmay notcomeout.
B. Releasing the optical block lock
(1)
Remove mirrorbm unit(No. 23) hddiW mrews.
(2) Remove mirrcrbese(No.4~ hofdi~ecr~ (SF-73Won~).
H4ing screw
(Frontframestie)
2–2
. ....
——.-—. .
..-