4 5
I - ASSEMBLING THE BOWL FIXATION RODS
II - ADJUSTING THE FRAME HEIGHT
➊
Measure the between-axis of the bowl (A)
➋
Place the rods (f) in the holes in the frame
corresponding to the between-axis and x them
in place with 2 nuts.
➊
Place the frame in its nal position
➋
Unscrew the 4 nuts (k)
➌
Adjust the leg heights so that the top of the bowl is at
about 400 mm from the nished oor
➍
Check that the frame is horizontally level, and screw
the nuts back in.
If the frame is xed onto a bare oor, the maximum
thickness of the finished floor should not exceed
185 cm.
A
➊
➋
k
f