76
➊
Mark the drilling points
➋
Remove the frame and drill to a depth of 55 mm
at maximum, using an 8 mm diameter drill bit for
ground metal plugs. For wall plugs use a 10 mm
diameter drill bit, and drill to a depth of 70 mm
➌
Move the frame back in place, position the metal
pegs (i) in the holes without any effort
V - PREPARING THE BOWL EVACUATION CONNECTION
➊
Measure the diameter of the evacuation pipe at the
place where it will be attached to the xation clip.
➋
Attach the xation clip using 2 screws and washers
(e) and adjust the height according to the measured
diameter. Marks are engraved on the clip to guide
you.
➋
➋
➋
➋
d
e