Siebeck GmbH Translation of the original operating manual jet_in_bed_0315
Seite 9
Set-up and commissioning
Erect the machine in the designated location and press the roller wheel locks
down so that the machine is stable.
To avoid collisions with other machines, as well as for adequate
access for the operating and maintenance personnel, there must
be a clearance of min. 1.5 metres around the machine.
If not otherwise stipulated, the machine is designed for 400 volt 3-phase
alternating current and 50 Hz, when supplied from the factory. Measure the
local mains voltage and compare the measurement with the value specified
on the type plate.
Check that the machine is correctly grounded. Adhere to the local electrical
engineering regulations. Maximum fuse protection 16 amperes.
Checking the motor direction of rotation
The machine comes with a rotation direction monitoring device (phase
sequence relay).
Connect the machine via the mains plug to the mains. Turn on main switch.
If the pilot light does not light up, then there is an incorrect phase sequence.
The monitoring device locks the power supply. Two phase wires must be
exchanged on the mains plug for the correct direction of rotation.
Strapping material
The knotting mechanism is designed for a maximum thickness of 900 linear
metres per kilogram (ELA-900). We recommend obtaining the material from
the machine manufacturer during the warranty period. This prevents the
possible loss of the warranty claim, which could be caused by the incorrect
use of the material.