EasyManua.ls Logo

Siemens 1LA8 - Page 7

Siemens 1LA8
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3.1 Checking winding connections...............................................................................................71
6.3.2 Terminal designation..............................................................................................................72
6.3.3 Selecting cables.....................................................................................................................72
6.3.4 Connecting the grounding conductor.....................................................................................72
6.3.5 Connect metal shield in the terminal box ..............................................................................73
6.3.6 Radio-frequency grounding for converter operation...............................................................73
6.3.7 Connection without terminal box............................................................................................74
6.3.8 Connecting the machine for a specific direction of rotation....................................................75
6.4 Introducing and routing the cables.........................................................................................75
6.4.1 Inserting the cable into the 1XB16... terminal box with cable gland ......................................75
6.4.2 Certified cable entries, thread adapters and sealing plugs....................................................76
6.4.3 Inserting the cable into the 1XB.. terminal box with ring seal.................................................77
6.4.4 Laying cables.........................................................................................................................78
6.4.5 Connecting cables with cable lugs.........................................................................................78
6.4.6 Connection without cable lugs...............................................................................................79
6.4.7 Use of aluminum conductors..................................................................................................81
6.4.8 Using single-stranded cables.................................................................................................82
6.4.9 Internal equipotential bonding................................................................................................82
6.4.10 Stepless mating face for sealing in the terminal box cover (not for GT640)..........................82
6.4.11 Minimum air clearances.........................................................................................................83
6.4.12 Finishing connection work......................................................................................................83
6.5 Connecting the auxiliary circuits.............................................................................................83
6.5.1 Selecting cables.....................................................................................................................83
6.5.2 Bringing cables into the auxiliary terminal box and routing them...........................................84
6.5.3 Connect metal shield in the terminal box ..............................................................................85
6.5.4 Intrinsically safe circuits for sensors or probes......................................................................85
6.5.5 Connecting temperature monitoring for the stator winding....................................................85
6.5.6 Terminating the connection work (auxiliary circuit)................................................................86
7 Start-up.......................................................................................................................................................87
7.1 Checks to be carried out prior to commissioning ..................................................................87
7.2 Converter operation...............................................................................................................88
7.2.1 Operation on a converter with a low pulse frequency............................................................89
7.3 Measuring the insulation resistance before commissioning...................................................89
7.4 Greasing the roller bearings prior to commissioning..............................................................90
7.5 Setpoint values for monitoring the bearing temperature........................................................91
7.6 Set values for monitoring the winding temperature................................................................91
7.7 Test run..................................................................................................................................92
7.8 De-energizing.........................................................................................................................93
8 Operation....................................................................................................................................................95
8.1 Safety guidelines in operation................................................................................................95
8.2 Operation in hazardous areas................................................................................................96
8.3 Switching off the anti-condensation heating...........................................................................97
8.4 Switching on the machine......................................................................................................98
8.5 Regreasing roller bearings.....................................................................................................98
Table of contents
SIMOTICS TN Series N-compact 1LA8
Operating Instructions 08/2017 7

Table of Contents

Other manuals for Siemens 1LA8

Related product manuals