Connection  09.02 
3-16  Siemens AG    6SE7087-6AK85-1AA0 
  Rectifier/Regenerating Unit    Operating instructions 
35
Cable binder
Connector
Slide on shield
and secure with
shrink-on tubing,
for example
Adapt length
to design
Do not bend
spring over
Shield
Fitting the shielding clamp
Releasing the shielding clamp
manually or using a screwdriver,
press the clamp together and extract
it in the updown direction.
Caution!
The clamps are sharp-edged!
Ø 
≤ 
15mm Ø 
≤
 7.5mm Ø 
≤
 5mm
 
Figure 3.6  Connecting the control leads and handling the shielding clamps 
 
If two shielding clamps cannot cope with the number of control leads on the Size C unit, the "EMC shielding 
enclosure" option should be used. 
Order number: 
♦ Size C  6SE7090-0XC87-3CA0 
 
 
3.3.3  Terminals and setting elements on the CUR (A10) module 
X100
X101
X102
PMU
X104
R135
R136
S1
S2
A10
CUR
 
Figure 3.7  Control terminals and setting elements on the CUR 