EasyManuals Logo

Siemens CU240B-2 Compact Operating Instructions

Siemens CU240B-2
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
CU240B-2 and CU240E-2 Control Units
6 Compact Operating Instructions, 04/2015, A5E35792002B AA
2
Scope of delivery
The delivery comprises at least the following components:
A CU240B-2 or a CU240E-2 control unit with firmware, which is ready to run. Options for
upgrading and downgrading the firmware can be found on the Internet: Firmware
(http://support.automation.siemens.com/WW/news/en/67364620).
The fieldbus interface of the Control Unit depends on the Article No. The Article No., the
designation and the version of the hardware (e.g. 02) and firmware (e.g. 4.6) can be
found on the rating plate
of the Control Unit.
Designation Article number Fieldbus
CU240B-2 6SL3244-0BB00-1BA1 USS, Modbus RTU
CU240B-2 DP 6SL3244-0BB00-1PA1 PROFIBUS DP
CU240E-2 6SL3244-0BB12-1BA1 USS, Modbus RTU
CU240E-2 F 6SL3244-0BB13-1BA1
CU240E-2 DP 6SL3244-0BB12-1PA1 PROFIBUS DP
CU240E-2 DP-F 6SL3244-0BB13-1PA1
CU240E-2 PN 6SL3244-0BB12-1FA0 PROFINET IO, EtherNet/IP
CU240E-2 PN-F 6SL3244-0BB13-1FA0
Compact Operating Instructions in German and English
The inverter contains open-source software (OSS). The OSS license terms are saved in
the inverter.
Reading the OSS license terms
The inverter contains open-source software (OSS). OSS comprises open source text and
satisfies special license terms. If you wish to read the license terms, you must transfer them
from the inverter to a PC.
P
rocedure
To transfer the OSS license terms from the inverter to a PC, proceed as follows:
1. S
witch off the inverter power supply.
2. Insert an empty memory card into the card slot of the inverter. See also Section:
Overview of the interfaces (Page 8)
3. Switch on the inverter power supply.
4. When you have switched on the power supply, wait 30 seconds.
During this time, the inverter writes the "Read_OSS.ZIP" file onto the memory card.
5. Switch off the inverter
power supply.
6. Withdraw the memory card from the inverter.
7. Use a card reader and load the file to a PC.
You have then transferred the OSS license terms from the inverter to a PC, and you can now
read the license terms.

Other manuals for Siemens CU240B-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens CU240B-2 and is the answer not in the manual?

Siemens CU240B-2 Specifications

General IconGeneral
BrandSiemens
ModelCU240B-2
CategoryInverter
LanguageEnglish

Related product manuals