EasyManua.ls Logo

Siemens CU240B-2 - Page 29

Siemens CU240B-2
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing
3.3 Installing Control Unit
Converter with Control Units CU230P-2; CU240B-2; CU240E-2
Getting Started, 04/2014, A5E32885834B AB
29
Default setting 7: Switch over between fieldbus and jogging using DI 3
All Control Units
Selected with
STARTER: Fieldbus with data set switchover
BOP-2: FB cdS
Factory setting for inverters with PROFIBUS or PROFINET interface
Default setting 8: Motorized
potentiometer (MOP) with safety
function
Control Units CU240E-2
Selected with
STARTER: MOP with Basic Safety
BOP-2: MoP SAFE
PROFIdrive telegram 1
The CU 240B-2 does not have
terminals 16 and 17
Fieldbus interface is not active.
The CU 240B-2 does not have
terminals 16 and 17
Fieldbus interface is not active.
Default setting 9: Motorized
potentiometer (MOP)
All Control Units
Selected with
STARTER: standard I/O with MOP
BOP-2: Std MoP
Default setting 12: Two-wire control
with method 1
All Control Units
Selected with
STARTER: Standard I/O with
analog setpoint
BOP-2: Std ASP
Factory setting for inverters with RS485
interface
Default setting 13: Setpoint via analog
input with safety function
Control Units CU240E-2
Selected with
STARTER: Standard I/O with
analog setpoint and safety
BOP-2: ASPS
Fieldbus interface is not active.
The CU 240B-2 does not have
terminals 16 and 17
Fieldbus interface is not active.
The CU 240B-2 does not have
terminals 16 and 17
Fieldbus interface is not active.

Other manuals for Siemens CU240B-2

Related product manuals