Area dose product measurement device 9
Siemens AG SPR2-240.814.04 Page 9 of 10 POWERMOBIL/ARCOSKOP
Medical Engineering Rev. 02 07.00 TD SD 24
Concluding steps 1
• Reinstall all the covers.
• Perform the protective conductor measurement as specified in ARTD-002.731.17.
• Perform partial acceptance tests in compliance with country-specific regulations.
Changes to previous version 1
Page 4 new