EasyManuals Logo

Siemens PR4018-05 User Manual

Siemens PR4018-05
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
INTRODUCTION
Page 2
INSPECTION FOR STORAGE PRIOR TO
DAMAGE IN SHIPMENT INSTALLATION
Check each item with the shipping manifest immediately
upon receipt of the regulator. Make a thorough visual in-
spection of the regulator. Check for evidence of damage
attributable to mishandling in shipment. Should any short-
age or damage be found, notify the local agent of the carrier
making the delivery and make appropriate notation on the
freight bill. Any damage or shortage that is not noted on the
freight bill becomes the recipients responsibility. A claim
should be made immediately with the carrier. Please also
notify your Siemens representative as soon as possible.
Assure that the control compartment enclosure is tightly
closed, and regulator tank is sealed.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens PR4018-05 and is the answer not in the manual?

Siemens PR4018-05 Specifications

General IconGeneral
BrandSiemens
ModelPR4018-05
CategoryPower Supply
LanguageEnglish

Related product manuals