Orient breaker into bracket and fasten with #8-32 screws.
Align and fasten bus extension to straps using 5/16"-18 screws per phase.
Tighten all screws to specified torque values.
Install Branch Neutral Lug Assembly on panelboard Z-rails.
Install Branch Neutral Lug Assembly on switchboard neutral.
Tighten neutral lug assembly screws to specified torque values.
Install filler assembly into cover plate opening, securing with screws and lock nuts.
Position cover plate over unit space and fasten with 1/4"-20 screws.
Mark and attach ID cards to rear of card holder, then to cover plate.
Ensure deadfront, barriers, and fillers are secure before energizing.
Locate 5" unit space by measuring from the deadfront support.
Remove all devices and components from the existing branch module.
Check shipping box for all included kit components.
Assemble Top Barrier to A/C-phase bus for P4 panelboards.
Fasten Top Barrier to B-phase strap for P5 panelboards.
Fit protruding Top Barrier Support bracket ends into pockets on the Top Barrier.
Fasten B-phase strap vertically centered in the unit space.
Center Top Barrier in the unit space for P4 or P5 panelboards.
Position A/C-phase straps onto the A-phase bus and barrier.
Fasten straps to A-phase bus using screws from the Bus Hardware Kit.
Locate and secure Breaker Mounting Brackets to Base Rails with screws.
Slide Nut Keeper under each phase stab on the breaker's 'ON' side.
Assemble Bus Extension onto Nut Keeper using socket head cap screw.
Orient breaker into bracket and fasten with #8-32 screws.
Align and fasten bus extension to straps using 5/16"-18 screws per phase.
Tighten all screws to specified torque values.
Install Branch Neutral Lug Assembly on panelboard Z-rails.
Install Branch Neutral Lug Assembly on switchboard neutral.
Tighten neutral lug assembly screws to specified torque values.
Install filler assembly into cover plate opening, securing with screws and lock nuts.
Position cover plate over unit space and fasten with 1/4"-20 screws.
Mark and attach ID cards to rear of card holder, then to cover plate.
Ensure deadfront, barriers, and fillers are secure before energizing.
Locate 5" unit space by measuring from the deadfront support.
Remove all devices and components from the existing branch module.
Check shipping box for all included kit components.
Assemble Top Barrier to A/C-phase bus for P4 panelboards.
Fasten Top Barrier to B-phase strap for P5 panelboards.
Fit protruding Top Barrier Support bracket ends into pockets on the Top Barrier.
Fasten B-phase strap vertically centered in the unit space.
Center Top Barrier in the unit space for P4 or P5 panelboards.
Position A/C-phase straps onto the A-phase bus and barrier.
Fasten straps to A-phase bus using screws from the Bus Hardware Kit.
Locate and secure Breaker Mounting Brackets to Base Rails with screws.
Slide Nut Keeper under each phase stab on the breaker's 'ON' side.
Assemble Bus Extension onto Nut Keeper using socket head cap screw.