Installation, connecting up, commissioning
3.2 Installing the CP and commissioning
CP 1243-7 LTE
36 Operating Instructions, 01/2015, C79000-G8976-C381-01
Installing the CP and commissioning
Prior to installation and commissioning
Read the system manual "S7-1200 Programmable Controller"
Prior to installation, connecting up and commissioning, read the relevant sections in the
system manual "S7-1200 Programmable Controller", refer to the documentation in the
Appendix.
When installing and connecting up, keep to the procedures described in the system manual
"S7-1200 Programmable Controller".
One requirement for the commissioning of the CP is the completeness of the STEP 7 project
data (see below). You should also read the section "Configuration and operation (Page 41)".
Note
Inserting and removing the SIM card
Do not insert or r
emove the SIM card while the CP is operating.