EasyManua.ls Logo

Siemens S7-1200 - Page 98

Siemens S7-1200
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Programming the program blocks
5.3 TC_CONFIG for changing configuration data of the CP
CP 1243-7 LTE
98 Operating Instructions, 01/2015, C79000-G8976-C381-01
The codes BUSY, DONE and ERROR
The codes of DONE and ERROR are relevant only when BUSY = 0.
BUSY
DONE
ERROR
Meaning
0
0
0
No job being executed
You will find all other code combinations of DONE and ERROR in the following table.
The codes DONE, ERROR and STATUS
The following table shows the condition codes formed based on DONE, ERROR and
STATUS that must be evaluated by the user program.
DONE
ERROR
STATUS
Meaning
1
0
0000
H
Job executed without errors
0
0
7000
H
No job processing active (first block call)
0 0 7001
H
Job processing started (first block call)
0
0
7002
H
Job processing already active (renewed block call when BUSY = 1)
0
1
80E6
H
No query in progress (block call not started)
0
1
80EB
H
Query temporarily rejected (the CP is currently being configured by STEP 7)
0 1 80F6
H
Format error of a parameter in the called data block (wrong length, wrong format or
invalid value)
Check the "IF_CONF" SDT.
0 1 80F7
H
Wrong ID in the parameter fields of the configuration data:
Check the "IF_CONF" SDT.

Table of Contents

Other manuals for Siemens S7-1200

Related product manuals