EasyManuals Logo

Siemens SIMOTICS S-1FT2 User Manual

Siemens SIMOTICS S-1FT2
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #101 background imageLoading...
Page #101 background image
8.3 Commissioning procedure
The chapter describes the commissioning of the motor
Precondition
You have mounted and connected the motor correctly.
You have connected the fan for force-ventilated motors.
All safety relays are functional and activated.
Ensure that the frequency converter is correctly parameterized.
You have established a connection with the converter, e.g. via the Pro󹪝net interface X127.
You have an Internet connection.
Procedure
Note
Incorrect 󹪝rst commissioning due to power interruptions
Software updates are loaded when commissioning the motor at the converter for the 󹪝rst time.
These updates can take some time. The system does not respond in this time.
The drive will not be correctly commissioned if you interrupt the system power supply in this
phase.
During the complete commissioning phase, ensure that the power supply is never
interrupted.
1. Start the commissioning tool in the converter, e.g. STARTER, STARTDRIVE or the Web server
2. Follow the steps of the commissioning tool to commission the motor
Switching o󹪜
Switch o󹪜 the motor at the frequency converter.
Commissioning
8.3Commissioning procedure
SIMOTICS S-1FT2 synchronous motors for SINAMICS S120
Operating Instructions, 12/2023, A5E50610821B AF 99

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMOTICS S-1FT2 and is the answer not in the manual?

Siemens SIMOTICS S-1FT2 Specifications

General IconGeneral
BrandSiemens
ModelSIMOTICS S-1FT2
CategoryEngine
LanguageEnglish

Related product manuals