8.3 Commissioning procedure
The chapter describes the commissioning of the motor
Precondition
• You have mounted and connected the motor correctly.
• You have connected the fan for force-ventilated motors.
• All safety relays are functional and activated.
• Ensure that the frequency converter is correctly parameterized.
• You have established a connection with the converter, e.g. via the Pronet interface X127.
• You have an Internet connection.
Procedure
Note
Incorrect rst commissioning due to power interruptions
Software updates are loaded when commissioning the motor at the converter for the rst time.
These updates can take some time. The system does not respond in this time.
The drive will not be correctly commissioned if you interrupt the system power supply in this
phase.
• During the complete commissioning phase, ensure that the power supply is never
interrupted.
1. Start the commissioning tool in the converter, e.g. STARTER, STARTDRIVE or the Web server
2. Follow the steps of the commissioning tool to commission the motor
❒
Switching o
• Switch o the motor at the frequency converter.
Commissioning