EasyManua.ls Logo

Siemens VersiCharge - Switching On and Testing

Siemens VersiCharge
73 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting / Installing / Connecting
4.10 Switching on and testing
VersiCharge AC Wallbox IEC
36 Operating Instructions, 03/2021, A5E50366109-AA
4.10 Switching on and testing
Procedure for switching on and checking the charging unit
Perform the following steps to switch on and check the charging unit.
1. Switch on the power supply for the supply of the charging unit.
2. Switch on the backup fuses, the load breaker switch and the RCCB.
3. The "Power" LED lights up on the charging station.
If the display does not light up on the charging unit, check the power supply with a
measuring instrument. When measuring, follow the regional regulations.
Test run with acceptance:
Perform the measurements according to DGUV regulation 3 or the comparable regional
regulations.
Concluding work
1. Remove the packing material and protective films.
2. Clean the unit if required.
3. Complete the commissioning report in accordance with the regional regulations, e.g. DGUV
regulation 3.
Note
The VersiCharge charging unit
s are designed for continuous operation. Daily reboots (power
cycle) may affect the service life of the components.

Table of Contents