EasyManua.ls Logo

Simpson 460 4 Series - Installation; Unpacking and Inspection

Simpson 460 4 Series
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION
II
INSTALLATION
2.1
GENERAL
2.1.11
This
section
contains
information
and
instructions
for
the
installation
and
shipping
of
the
460.
Included
are
unpacking
and
inspection
procedures,
warranty,
shipping,
power
source
require-
ments,
installation,
and
care.
2.2
UNPACKING
AND
INSPECTION
2.2.4
Unpack
and
inspect
the
Instrument
for
possible
damage
in
shipment.
Check
the
electrical.performance
as
soon
as
possible.
If
damage
is
noted,
notify
the
carrier
and
supplier
before
using
the
Instrument.
Also,
check
that
all
items
are
included
(Table
1-2).
2.2.2
Save
the
shipping
carton
and
packing
materials
for
future
storing
or
shipping
of
the
Instrument.
2.3
SHIPPING
2.3.4
Pack
the
Instrument
carefully
and
ship
it
prepaid
to
the
proper
destination.
Insure
the
Instrument.
2.4
POWER
SOURCE
REQUIREMENTS
2.41
The
460A
is
designed
to
be
operated
from
an
AC
line
only.
The
460D
is
designed
to
be
operated
from
either
an
AC
line
or
self-contained
nickel-cadmium
cells
(not
furnished
with
the
Instrument
but
available
from
any
local
electronic
parts
dis-
tributor.
(Refer
to
Table
1-1,
item
9.)
2.4.2
AC
Line
Operation
2.4.3
Тһе
460
is
wired
at
the
factory
for
120
VAC
(50
to
400
Hz)
operation.
To
convert
the
Instrument
for
240
VAC
operation,
consult
the
nearest
Authorized
Service
Center.
2-1

Related product manuals