TRANSPORTING AND LIFTING THE MACHINE
GTZZ18J Operation Manual 8-3 © Oct. 2022
NOTICE
To protect the machine, choose rigging with
appropriate length.
TRANSPORTING THE
MACHINE
Follow these requirements when transporting the
machine by truck or trailer:
1. Before transporting, turn the key switch on ground
controller to OFF, and remove the key.
2. Thoroughly inspect the machine for loose or
untightened components and ensure the turntable
rotation pin is locked.
3. Ensure the binding ropes or belts are of sufficient
strength.
4. Use at least 4 ropes/belts to fasten the chassis and
1 rope/belt for the platform.
5. Adjust the rigging to prevent damage to the ropes/
belts.
6. To protect the boom components and platform
weighing sensors, do not apply excessive
downward force to the rope/belt fastened near the
platform. It is recommended to add a foam layer
beneath the platform and ensure the platform is
suspended.
Figure 8-3