EasyManua.ls Logo

Sinoboom AB520EJ - Conducting a Pre-Operation Inspection; Inspecting Machine Components

Default Icon
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Dec 2021 5-2 GTZZ14EJ&16EJ Operation Manual
PRE-OPERATION INSPECTION
Only qualified maintenance technicians can repair
the machine according to the manufacturer's
regulations. After any maintenance, the operator
must perform another pre-operation inspection
before conducting a pre-operation function test.
Qualified maintenance technicians must perform
regular maintenance inspections according to the
requirements in the manufacturer’s Maintenance
Manual.
CONDUCTING A PRE-
OPERATION INSPECTION
Before starting the machine, check whether it meets the
following requirements:
Ensure the Operation Manual and Maintenance
Manual are in good condition, legible and stored in
the storage compartment on the platform.
Make sure all labels are legible and appropriately
located.
Check for hydraulic oil leaks and proper oil level.
Add oil as needed. See Inspect Hydraulic Oil
Level, page 5-2.
Check battery for leaks and proper liquid level. Add
distilled water as needed. See .
Check whether the protective device in use matches
the type of work performed and conforms to relevant
technical standards.
INSPECTING PARTS
Before each use or work shift,check the machine for
any damaged, improperly installed, loose or lost parts
and unauthorized changes:
Electrical components, wirings,cables and safety
ropes
Hydraulic hoses & fittings, hydraulic cylinder and
valve block
hydraulic tank
Storage battery pack and its connection
Drive motor & brake
Turntable swing motor and hydraulic pump
Boom wear pads and telescopic axle wear pads
Limit switch and horn
Tire and rim
Alarms and lighting (if equipped)
Platformincluding rails, floor plate, safety lock,
brackets and entry door
Personal protection equipment
Emergency control equipment
Operation instructions, warning and control decals
Structure and welding cracks
Nuts, bolts and other fasteners
NOTICE
If damaged parts, incorrect installation or missing
parts are discovered, please replace immediately
and install correctly; if the fasteners are found
detached or loose, please secure immediately.
INSPECTING ENTIRE
MACHINE
Inspect the entire machine for:
Control switches and handles on platform controller
and turntable controller in neutral position
Cracks in a weld joint or structural part
Dents or other damage
Severe rust, corrosion or oxidation
Improper twisting of steel wire ropes, electric
cables, hoses inside the platform
Missing or loose structural parts and key
components, including fasteners and pins for
correct positioning and tightness
After the inspection, ensure all covers are in place
and securely locked
INSPECT HYDRAULIC OIL
LEVEL
Ensuring appropriate hydraulic oil level is vital to proper
operation of the machine. If too high, the oil will spill out
from the oil tank during machine operation, if too low,
the oil pump will suction air and damage hydraulic
components. Performing daily inspection of the
hydraulic oil level will help you determine if a problem
exists in the hydraulic system.
Perform the following procedures with the boom in
stowed position:
1. Open the left turntable cover to make visual
inspection of the sides of hydraulic tank, the

Table of Contents

Other manuals for Sinoboom AB520EJ

Related product manuals