EasyManua.ls Logo

Sinoboom AB520EJ - Transporting the Machine by Truck or Trailer

Default Icon
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TRANSPORTING AND LIFTING THE MACHINE
GTZZ14EJ&16EJ Operation Manual 8-3 © Dec 2021
TRANSPORTING THE
MACHINE
Follow these requirements when transporting the
machine by truck or trailer:
1. Before transport, turn the key switch on ground
controller to OFF, and remove the key.
2. Perform a thorough inspection of the machine to
prevent loose or untightened components.
3. Ensure the rope or belt is of sufficient capacity.
4. Use at least 4 ropes/belts to fasten the chassis and
one rope/belt for the platform.
5. Adjust the rigging to prevent damage to the rope/
belt.
6. To protect the boom components and platform load
sensors, do not apply too large a downward force to
the rope/belt fastened near the platform. It is
recommended to add a foam layer beneath the
platform and ensure the platform is suspended in
the air.
Figure 8-3

Table of Contents

Other manuals for Sinoboom AB520EJ

Related product manuals