EasyManua.ls Logo

Sinoboom ML270EJ - Transporting the Machine

Sinoboom ML270EJ
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TRANSPORTING AND LIFTING THE MACHINE
GTTZ10EJ Operation Manual 8-3 © Mar. 2022
Figure 8-2
5. Attach the rigging to the both lifting eyes.
Figure 8-3
6. Only connect the rigging to the designated lifting
points on the machine. Adjust the rigging to avoid
damaging the machine and to keep the machine
horizontal.
NOTICE
To protect the machine, choose the appropriate
length of rigging.
TRANSPORTING THE
MACHINE
Follow these requirements when transporting the
machine by truck or trailer:
1. Keep the machine in stowed position.
2. Turn the key switch at the ground controls to OFF
position, and remove the key.
3. Remove all loose or insecure parts.
4. Ensure the rope or belt is of sufficient capacity.
5. Use at least 4 ropes/belts to fasten the chassis and
one rope/belt for the platform.
6. Adjust the rigging to prevent damage to the rope/
belt.
7. To protect the boom components and platform load
sensors, do not apply too large a downward force to
the rope/belt fastened near the platform. It is
recommended to add a foam layer beneath the
platform and ensure the platform is suspended in
the air.

Table of Contents

Other manuals for Sinoboom ML270EJ

Related product manuals