EasyManua.ls Logo

Sinoboom TB24 Plus - Appendix 2: Prepare the Work Record Before Delivery

Default Icon
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TB24 Plus&26J Plus Operation Manual A-3 © Jun 2022
APPENDIX 2: PREPARE THE WORK
RECORD BEFORE DELIVERY
PREPARE THE WORK RECORD BEFORE DELIVERY
Model
Serial No.
Inspection Item
YES/Machine is in
Good Condition
NO/Machine Has
Damage or Malfunction
REPAIRED/Machine
Has Been Repaired
Pre-operationalInspection
Maintenance Procedure
Functional Inspection
Machine Buyer/ Renter
Inspector Signature
Inspector Title
Inspector Company
NOTE:
1. Prepare the machine before delivery, which includes performing a pre-delivery inspection, following
maintenance procedures and performing functional inspections.
2. Use the table to record the results. After each section is complete, mark the appropriate box.
3. Record the inspection results. If any inspection results are "NO", the machine must be stopped and re-
inspected after repair is completed and marked in the box marked "inspection".

Table of Contents

Other manuals for Sinoboom TB24 Plus

Related product manuals