1 Preparations Sirona Dental Systems GmbH
Installation Requirements C5
+
, C5
+
Tur n
60 27 978 D3415
12 D3415.021.03.08.02
Important information for the installer
Depending on the prevailing local conditions, the existing
cable set can be installed in the cable duct of an underfloor
installation by an installer prior to the installation of the
treatment center. In this case, please observe the following:
Proceed with extreme care when running the cables. Par-
ticularly cables L15 and L38 are very sensitive, and must
never be kinked or twisted. The cables must not overlap or
cross one another.
RS232 (L37) and the XGA cable (L38) are not yet cut to
length and terminated on the PC side. It would be impossi-
ble to pull the cables through when installing them under
floor level if a sub D connector were already connected.
These cables should always be pulled.
Free length A of cables at the treatment center end:
Length A = 600mm
If S video cable L15 is equipped with both a female and a
male connector, make sure that the female connector
(socket) points to the connection box of the treatment cen-
ter.
1. Bend the wire at the front end of cables L37 and L38 to
form a hook.
2. Pull cables L15, L37, L38 and the grounding cable of
the treatment center through the cable duct to the loca-
tion of the PC.
Save the accessory parts for final installation!
1.5 Underfloor installation of SIVISION connections