EasyManuals Logo

Skyjack SJ12 Operating Manual

Skyjack SJ12
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #59 background imageLoading...
Page #59 background image
Section 5 Labels
Labels - Models SJ12 & SJ16
Label Pictorial Description
4
Emergency Lowering Procedure
Refer to Operating manual.
1. Turn main power disconnect switch to off position.
2. Pull emergency lowering valve to lower the platform.
5
Winching/Towing/Pushing Procedure
Refer to Operating manual.
1. Block or chock wheels to prevent aerial platform from rolling.
2. Turn main power disconnect switch to off position.
3. Locate brake valve and pump.
4. Push in black knob. Pump by pushing red knob in and out
until firm resistance is felt. Brake is now released.
5. Push/tow/winch to desired location.
6. Block or chock wheels to prevent aerial platform from rolling.
7. Reset brake by pulling out black knob.
Rear View (Continued)
5
4
Vertical Mast
Page 59
TM

Other manuals for Skyjack SJ12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ12 and is the answer not in the manual?

Skyjack SJ12 Specifications

General IconGeneral
Gradeability25%
Drive Motor24V DC
Machine Width32 in (0.81 m)
Stowed Height6.5 ft
Overall Width32 in (0.81 m)
Stowed Height (Rails Folded)6.5 ft
Drive Speed (Elevated)0.5 mph (0.8 km/h)
Power SourceElectric

Related product manuals