OPERATION
MANUAL
VERTICAL MAST
213721AAA
September 2019
ANSI/CSA
SJ12, SJ16

Table of Contents

Other manuals for Skyjack SJ12

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ12 and is the answer not in the manual?

Skyjack SJ12 Specifications

General IconGeneral
Gradeability25%
Drive Motor24V DC
Machine Width32 in (0.81 m)
Stowed Height6.5 ft
Overall Width32 in (0.81 m)
Stowed Height (Rails Folded)6.5 ft
Drive Speed (Elevated)0.5 mph (0.8 km/h)
Power SourceElectric

Summary

Section 1 – About this Mobile Elevating Work Platform (MEWP)

1.1 Read and heed

Understanding manual, labels, and operator qualifications for safe operation.

Section 2 – General Safety Precautions

2.1 Electrocution hazards

Safety measures for working near electrical conductors and avoiding electrocution.

2.2 Safety instructions

Key safety guidelines including fall protection, operating conditions, and power disconnect.

2.3 Fall-protection

Procedures for safe entry/exit and fall hazard prevention using guardrails and anchorages.

2.4 Worksite inspection

Importance of inspecting the worksite for potential hazards before operation.

Section 4 – Inspections Before Operation

4.1 Operator's Responsibility

Tasks required of the operator before each work shift, including inspections and tests.

4.2 Visual and daily maintenance inspections

Step-by-step guide for daily visual and maintenance checks of MEWP components.

4.3 Function tests

Procedures for testing all MEWP operational functions to ensure safety and performance.

Section 5 – Operation

5.1 Energize the base control console

Steps to safely power up the base control console before operation.

5.2 Raise or lower the platform with the base control console

Procedure for controlling platform lift and lower movements using the base console.

5.3 Energize the platform control console

Steps to safely power up the platform control console for elevated operation.

5.4 Raise or lower the platform with the platform control console

Procedure for controlling platform lift and lower movements using the platform console.

Section 6 – Additional Procedures

6.1 Use the emergency-lowering function

Procedure for safely lowering the platform during primary power failure.